Green Waste Material Recovery Facility (Moving Towards Zero Waste)

Raw material: urban garbage
Life time: more than 7 years
Feeding form loader: indirect feeding
Stytle environmental: friendly
Certification: CE/ISO/SGS
Delivery: 60 days after first payment
Packing: 7×40 open top container + 2LCL
Power: 149kw-279KW
Capacity: 100-400T/D

Waste is the resource but put in the wrong place.There is a face that we all should know many of the materials we consider as waste can actually be reprocessed and used either for recycling or energy resources. In order to protect our environment and our planet, Beston has found the economic and reliable solutions to recycle many types of valuable materials from the waste stream and sort them efficiently according to the specific needs of our customers.

The Flow Chart of the Green Waste Material Recovery Facility:

A materials recovery facility is Specialized plant that Receives, Separate and Prepare recyclable material for marketing to end-user manufacturers. The mechanical sorting mechanisms and processes include:

conveyors, sorting stations, screens, separators, magnets, optical sorters, bag breaker, and an eddy current separator.
Processing at the facility begins manually, becomes mechanical, and then goes back to a manual process for final quality control. The result is unparalleled diversion and consistently cleaner product.

Note:
If you have any problem about Waste Material Recovery Facility, welcome to Contact Us, we will give you more information about what you want to know!

Some Parts of the Green Waste Material Recovery Facility

Bag Breaker
Bag Breaker
Uniform-material-spreader
Uniform-material-spreader
roller-screening-machine1
roller-screening-machine1

Technical Data of the Green Waste Material Recovery Facility:

Model BFX-100 BFX-200 BFX-400
Raw materials Municipal solid waste, household waste, industrial waste, landfill waste and mining waste
Capacity 5 T/H 10T/H 20T/H
Power 149KW 224.7KW 279KW
Area 2400㎡ 2800㎡ 3000㎡
Working time 20 hours 20 hours 20 hours

Applications of Final Products:

NO. End products Productivity      Usage
1 plastic film 12% 1.turn to plastic particals to reuse2.pyrolysis to oil
2 paper 5% 1.make pulp to prodce new paper
3 metal 5% 1.smelt new metal
4 glass 3% 1.recovery for reusing
5 bettary,textle,bulk garbage etc 5% 1.recovery
6 biomass:straw,shell,faeces,food residue etc 70% 1.biomass carbonizatin for charcoal

The advantages of the Green Waste Material Recovery Facility:
1.Reasonable structure and configuration, high level automatic operation
2.Smoothly conveying system, feeding evenly without jam; Reasonable connecting method for every transition point without material leak or accumulation.
3.High level wearability and anti-corrosion are requested on every belt conveyor. Each belt owns more than two years serving life.
4.equipped with urgent button located in reasonable position to avoid error starting or electrocution.
5.Automatic control during operation, using programmable controller

Get a Free Quote

Interested in our products? Please give your inquiry in the form below. We will reply you in 12 hours.

* Your Name

* Your Email

* Your Phone Number

* Your Country

Your Company

* Your Requirement

*We respect your privacy, and will not share your personal information with other entities.

Translate »