BST-06Max Global Launch

-Pilot Continuous Biochar Machine

Validate First !
Invest Smarter !
Control Risk Better !

Launch Time: March 12, 2025.

Pilot Continuous Biochar Machine

Pilot BST-06Max: 3-Month Rapid Validation to
Enter the Carbon Credit Market

Want to enter the carbon market quickly, at low cost and low risk? With pilot BST-06Max, you can complete the feasibility validation of biochar production
project within just 3 months. The key timeline is as follow:

14

Confirm carbon capture technology selection

28

Complete project preliminary assessment

90

The project is officially operational with CORC certificate

BST-50s max

Equipment Cost: Medium
Equipment Shipping Cost: Medium
Operation Cost: Medium
Capacity: 3000-5000KG/H

Large-scale Production Option

75%Cost Reduction

BST-06Max

Equipment Cost: Low
Equipment Shipping Cost: Low
Operation Cost: Low
Capacity: 75-150KG/H

Low-risk Validation Option

Industry Peers

Equipment Cost: High
Equipment Shipping Cost: High
Operation Cost: High
Capacity: 150KG/H

?

60-90%Cost Reduction

Safe & Stable Operation: 8000 Hours per Year

The Fourth-generation BST-06 Max gives you safer and longer continuous operation than ever. An optimized tar-free and dust self-cleaning system enables
incredibly 8,000 hours opeartion per year. Find the continuous technology breakthrough process!

First-generation

  • Large output of wood
    vinegar & tar
35hcontinuous operation

Second-generation

  • Reduce output of wood
    vinegar & tar
  • Reduce dust buildup
120hcontinuous operation

Third-generation

  • Avoid output of wood vinegar
    and reduce tar
  • Avoid dust buildup
360hcontinuous operation

Fourth-generation

  • Optimized tar-free and
    dust self-cleaning
720hcontinuous operation

High-quality Biochar Meets EBC Standards

Testing shows the biochar meets EBC standards for most application scenarios, and international carbon removal standard. Simply choose BST-06 Max now,
make your biomass into carbon credits more easily! Refer to the test data below:

Pilot Continuous Biochar Machine
Load capacity EBC Standard German Laboratory Chinese Laboratory
H/C Molar Ratio <0.4 – 0.7 0.45 (Generally Meets All Application Standards) 0.11 – 0.32
Heavy Metal Depends on Specific Application Fully Meet All Fully Meet All
PAHS-8 Depends on Specific Application Fully Meet All /
PAHS-16 <6 mg/kg Compliant with EBC-Feed, Urban, Basic Material
Slightly above EBC Feed-Plus, Agro-Bio, Agro
0.2 mg/kg

Low Emissions, High Green Standards

Pilot Continuous Biochar Machine

Meet GHG Emission Standards

Low N₂O emissions: 1% of carbon stored in biochar;
Low CH4 emissions: 0.1% of carbon stored in biochar;

Pilot Continuous Biochar Machine

Meet Air Pollutants Emission Standards

The high-end exhaust treatment system cools, removes dust, desulfurizes, denitrifies and adsorbs the exhaust gas, ensuring that the exhaust emissions meet Singapore and European emission standards.

Parameter of BST-06Max Biochar Machine

Pilot Continuous Biochar Machine
Model BST-06 Standard BST-06MAX
Operating Mode Continuous
Dust Removal System Standard Advanced
Feeding Capacity 100-300KG/H 100-300KG/H
Final Products Biochar & Syngas
Pyrolysis Reactor Materials 304 stainless steel
Maximum Pyrolysis Temperature 650℃
Service Life 5-8 years
Annual Operating Time 8000 hours
Land Space Required (L*W*H*m) 25m*18m*6m
Workers Required/Shift 3 workers
Total Power (KW) 129.79 162.79
NG Preheating Fuel Consumption (M³/Time) 60~80
Water Consumption (M³/day) 0.8~1.5
Operation Pressure (Pa) ~20~30
Cooling Method Recycling cooling Water Industrial chiller
Packing 4*40HQ 1*40FR+6*40HQ

Start Carbon Removal Project Today!

Worried about investment risks? Unclear about biochar pyrolysis technology? From production to to certification,
BST-06Max will support you quickly enter the carbon market with low cost and low risk. Contact us to get free
customized solution now! Join us together to promote carbon neutrality.
Contact Us

    Contact Us

    Please fill in the form below and submit your inquiry. We will reply to you within 2 hours.

    Please specify your requirement by referring to the following aspects:

    1. What kind of material and expected end product are you planning to have? (The right solution begins with material and product)

    2. Which project stage are you currently in? Pre-research or comparison and evaluation? (Key info for project management)

    3. When is the project supposed to be running? (Key info for A-Z project programming)

    4. Budget for machinery purchasing? (Key info for right model)

    5. Points that you focus on. (Customized service from our project consultant)

    * Your Message: